Pillar 1: Zone Heatmaps & Spatial Bottlenecks
Real-time optical floor plan utilization, queue density gradients, and foot-traffic trajectory vectors across all CCTV camera stations.
Zone A • Smith & Squat Alley
7/8 Smith Machines active. Average set turnaround: 18.2 min. 1 lifter resting >3.5 min (nudge prompt queued).
Pillar 2: Machine & Rack Dwell Times
Deconstruct total equipment occupancy into active concentric/eccentric work, rest intervals, and idle phone distraction.
Optical tracking reveals that 54% of Smith Machine and Rack dwell time is passive rest between sets, with 18% lost to smartphone distraction.
Pillar 3: Safety Analysis (Future Direction)
Movement and safety analysis may follow the operations pilot after technical validation, legal review, and operator demand. This demo does not certify insurance outcomes or determine injury risk.
Pillar 4: Peak Hours & Congestion Reporting
Illustrative congestion patterns for testing the operator workflow. Retention impact requires a real-facility baseline and follow-up measurement.
| DAY | 06:00 | 08:00 | 10:00 | 12:00 | 14:00 | 16:00 | 18:00 | 20:00 | 22:00 |
|---|
Retention lift is not a current claim. The pilot will establish a baseline before any impact statement is made.
Live Data Warehouse ClickHouse Query Console
Illustrative query concepts for a future operator warehouse: fact_zone_dwell, fact_equipment_utilization, and fact_congestion_windows.